Thank you for your patience while we retrieve your images.
Visitors 45
Modified 18-Apr-24
Created 21-Jan-17
10 photos

This is the latest project that we completed just before Xmas 2016. The project involved the removal of the existing kitchen units, floor tiles and ceiling. We then installed a new lighting scheme, reboarded and skimmed the ceiling. Whilst removing the floor tiles we uncovered an old well which was then built up to floor level to allow a glass top to be fitted. The floor was levelled and new floor tiles laid. We then supplied and installed the new kitchen units and granite work tips for the client. In addition to the above a water softener was also installed.

Categories & Keywords
Category:
Subcategory:
Subcategory Detail:
Keywords: