This is a project completed earlier this year. The project involved removal of the existing kitchen and wood flooring. Underfloor Heat Mat was then installed with insulation mat below. The floor was then tiled and the new kitchen was then installed
Category:
Subcategory:
Subcategory Detail:
Keywords: